Circutor AFQ Series Manuel d'utilisateur Page 80

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 106
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 79
AFQ-4W
80 Instruction Manual
Figure 92: Unscrew the turbine fasteners
20.- Replace the turbine with the spare.
21.- Reinsert the pack into the cabinet.
22.- Fix the extractor hood.
23.- Connect the turbine power supply.
24.- Connect the R-S-T phases to the inverter bridge.
25.- Put the NTC probe cable back in the channel.
26.- Connect the NTC probe.
27.- Connect the IGBTs to the driver board and reinstall the driver board if
necessary.
Respect the R-S-T order of the connectors.
28.- Connect the DC bus busbar.
29.- Insert the top crossbar of the AFQ-4W cabinet.
30.- Connect the earth wire to the front panel metal plate of the AFQ-4W.
31.- Fit the protection board.
32.- Check that the turbine operates correctly.
Vue de la page 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 105 106

Commentaires sur ces manuels

Pas de commentaire