Circutor CEM-C30 series Manuel d'utilisateur Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 42
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
1�- VERIFICATION UPON RECEPTION
Check the following points upon receiving the unit:
a) The unit meets the specications described in your order.
b) The unit has not suffered any damage during transport.
c) Perform an external visual inspection of the unit prior to switching it on.
d) Check that it has been delivered with the following:
- An installation guide.
If any problem is noticed upon reception, immediately contact the transport
company and/or CIRCUTOR's after-sales service.
2�- PRODUCT DESCRIPTION
The CEM-C30 static three-phase energy meter measures class B active energy (EN50470)
and (optional) class 2 reactive energy (IEC 62053-23), with optional optical communications for
expansion with other modules installed on a DIN rail with a service port.
The current is measured with the transformer.
The unit features:
- 2 buttons that allow you to browse the different screens and program the unit.
- 2 Verication LEDs.
- LCD display, displays all parameters,
- 2 connection seals,
- 2 terminal covers, to cover the top of the terminal box and the xing screws.
6
CEM-C30
Instruction Manual
Vue de la page 5
1 2 3 4 5 6 7 8 9 10 11 ... 41 42

Commentaires sur ces manuels

Pas de commentaire